<?xml version="1.0" encoding="utf-8"?><rss xmlns:a10="http://www.w3.org/2005/Atom" version="2.0"><channel><title>College Service Updates</title><link>https://www.conestogac.on.ca/college-service-notices</link><description>Important Service Announcements from Conestoga College</description><managingEditor>webservices@conestogac.on.ca</managingEditor><category>service_notice</category><item><guid isPermaLink="false">44757</guid><link>https://www.conestogac.on.ca/college-service-notices</link><title>Conestoga Skilled Trades Campus driveway traffic change: January 2025 to summer 2026</title><description>The driveway in front of the Conestoga Skilled Trades Campus on Reuter Drive in Cambridge is changing back to one-way traffic in order to implement a pedestrian walkway. These changes will remain in place for the duration of Phase 2 construction into summer 2026. </description><a10:updated>2025-01-29T00:00:00Z</a10:updated></item><item><guid isPermaLink="false">44827</guid><link>https://www.conestogac.on.ca/college-service-notices</link><title>Winter term hours of operation</title><description>Hours of operation for campuses and sites have been updated for the winter term. Visit https://www.conestogac.on.ca/contact#hours for details. 
</description><a10:updated>2026-01-09T00:00:00Z</a10:updated></item><item><guid isPermaLink="false">44836</guid><link>https://www.conestogac.on.ca/college-service-notices</link><title>Waterloo campus scheduled power outage: June 6, 2026</title><description>A power outage is scheduled for Saturday, June 6, from 6 a.m. to 5 p.m., affecting all buildings. There will be no entry to the buildings; emergency power will remain operational throughout the shutdown.</description><a10:updated>2026-04-06T00:00:00Z</a10:updated></item><item><guid isPermaLink="false">44838</guid><link>https://www.conestogac.on.ca/college-service-notices</link><title>Conestoga Skilled Trades Campus high-voltage maintenance: May 3, 2026</title><description>High-voltage preventive maintenance is scheduled for the Conestoga Skilled Trades Campus on Reuter Drive in Cambridge on Sunday, May 3, 2026, from 6 a.m. to 5 p.m. There will be no entry to the building, and no classes or activities will take place. Power will be turned off, with emergency power remaining operational.</description><a10:updated>2026-04-09T00:00:00Z</a10:updated></item><item><guid isPermaLink="false">44839</guid><link>https://www.conestogac.on.ca/college-service-notices</link><title>Kitchener - Doon campus B-Wing elevator out of service: April 16, 2026</title><description>The elevator in the B-Wing of the Doon Main Building (DMB) at the Kitchener - Doon campus is out of service for one to two weeks. Please use the stairwell at Door 5. If you need help, please go to Campus Safety &amp; Security.</description><a10:updated>2026-04-16T00:00:00Z</a10:updated></item><item><guid isPermaLink="false">44843</guid><link>https://www.conestogac.on.ca/college-service-notices</link><title>All library locations closed: May 5, 2026</title><description>All library locations will be closed on Tuesday, May 5, for a staff planning day. Regular hours and services will resume on Wednesday, May 6. AskOn – an online chat service that provides quick research and account support – remains available at its regular hours (https://library.conestogac.on.ca/).</description><a10:updated>2026-04-23T00:00:00Z</a10:updated></item><item><guid isPermaLink="false">44844</guid><link>https://www.conestogac.on.ca/college-service-notices</link><title>Kitchener - Doon campus roadwork and utility service impacts – Rec Centre and TPEC: April 27, 2026</title><description>Gas service to the Student Recreation Centre (SRC) and Toyota Power Engineering Complex (TPEC) will remain interrupted until further notice.  Roadwork is ongoing in the area, and fencing will remain in place. Additional updates will be shared here as they become available.</description><a10:updated>2026-04-27T00:00:00Z</a10:updated></item></channel></rss>